Slip form concrete
Contents |
[edit] Introduction
Formwork is a temporary mould into which concrete is poured and formed. Traditional formwork is fabricated using timber, but it can also be constructed from steel, glass fibre reinforced plastics and other materials.
Slip form is a method of construction in which concrete is poured into the top of a continuously moving formwork. As the concrete is poured, the formwork is raised vertically at a speed which allows the concrete to harden before it is free from the formwork at the bottom.. Slip form is most economical for structures over 7 storeys high such as bridges and towers, as it is the fastest method of construction for vertical reinforced concrete structures, but it can also be used for horizontal structures such as roadways.
As long as there is a regular shape or core, formwork can be used for a smooth, continuous pour that requires no joints. The formwork supports itself on the core rather than relying on other parts of the building or permanent works, and rises at a rate of about 300 mm per hour.
The concrete to be used needs to be workable enough to be placed into the form and consolidated by vibration, yet quick-setting enough to emerge from the form with strength. The concrete must be constantly monitored for its setting rate to ensure the forms are not being raised too fast.
Usually, the formwork has three platforms:
- Upper platform: This acts as a storage and distribution area.
- Middle platform: This is the main working platform and sits at the top of the poured concrete level.
- Lower platform: This provides access for concrete finishing.
It is essential that the middle supporting platform is rigid so that all parts of the structure move simultaneously. The shuttering can drag if there is inconsistency in the rate at which the platform is moving which can cause difficulties.
[edit] Types of structure
The types of structure that are most commonly constructed used slip forming techniques include:
- Service cores for commercial buildings.
- Lift and stair shafts.
- Silos.
- Chimneys.
- Concrete gravity structures such as oil platforms.
- Bridge pylons and piers.
- Mine headgear towers.
- Shaft linings.
- Surge shafts.
- Liquid containment vessels.
[edit] Advantages of slip forming
- Slip forming can achieve high production rates, however, once continuous concreting has begun there is little flexibility for change and so very careful planning is required.
- Crane use is minimised.
- Only minimal scaffolding and temporary works are required allowing the construction site to be less congested, and so safer.
- The exposed concrete can be finished at the bottom of the rising formwork.
- Slip form systems require a small but skilled workforce on site.
- There is flexibility in that tapering structures with wall reductions (either gradual, over a short distance, or stepped) can be achieved.
[edit] Related articles on Designing Buildings Wiki
- Architectural concrete.
- Concrete.
- Differences between jumpform and slipform climbing formwork systems.
- Falsework.
- Formwork.
- Reinforced concrete.
- Scaffolding.
- Structural steelwork.
- Temporary works.
[edit] External references
- The Concrete Centre [[w/index.php?title=W/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DWww.concretecentre.com/technical_information/building_solutions/formwork/slip_form.aspx%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1&action=edit&redlink=1|Technical Information]]
- Bright Hub Engineering
Featured articles and news
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The remarkable story of a Highland architect.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
A new CIOB TIS on discharging CDM 2015 duties
Practical steps that can be undertaken in the Management of Contractors to discharge the relevant CDM 2015 duties.
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.
Access, history and Ty unnos.
The world’s first publicly funded civic park.
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building photo contest 2024 winners
Fresco School by Roman Robroek and Once Upon a Pass by Liam Man.